Matching engineering support to the exact project stage prevents wasted time and accelerates specification lock-in. Module 10 maps the 4 project readiness stages — Concept Design, Tender & Value Engineering, Submittal & Sample Sign-Off, and Container Dispatch — to concrete engineering deliverables.
Matching engineering support to the exact project stage prevents wasted time and accelerates specification lock-in. Module 10 maps the 4 project readiness stages — Concept Design, Tender & Value Engineering, Submittal & Sample Sign-Off, and Container Dispatch — to concrete engineering deliverables.
Applicable Scope & Boundary Conditions: Used by project developers and Tianya engineering sales to synchronize sample dispatch, CAD take-offs, and quarry block reservation.
| Verification Dimension | Authoritative Evidence & Technical Specification |
|---|---|
| Stage 1 · Concept & Moodboard (6–12 Months Out) | Deliverable: Digital high-res swatch library, SRI thermal data, and preliminary 5-piece finish sample box. |
| Stage 2 · Tender & Value Engineering (3–6 Months Out) | Deliverable: Good/Better/Best thickness & format matrix, 1:1 European limestone replacement cost comparison, and 20GP container freight budget. |
| Stage 3 · Final Submittal & Pre-Production (6–10 Weeks Out) | Deliverable: Signed Control Sample (SMP-ID), finalized CAD cut-to-size shop drawings, and 30% deposit block lock. |